Rooftop Solar Subsidy in Gujarat
What residential consumers in Gujarat can claim under PM Surya Ghar, how the application flows through your DISCOM, and what a rooftop system will actually generate at your latitude.
5.6 h
avg. peak sun hours / day
~133
units / kW / month
₹78,000
max central subsidy (3 kW+)
PM Surya Ghar subsidy window: 31 March 2027
The ₹78,000 central residential subsidy is sanctioned through the end of FY 2026-27 (31 March 2027). Apply and get commissioned well before this date — an extension is possible but not assured.
As of July 2026 — confirm the current position on pmsuryaghar.gov.in.
Central Subsidy Structure (National)
The PM Surya Ghar: Muft Bijli Yojana subsidy is uniform across India, including Gujarat. It is credited directly to the applicant’s bank account after commissioning and inspection.
| System capacity | Central assistance |
|---|---|
| First 2 kW | ₹30,000 per kW |
| Third kW | ₹18,000 per kW |
| Above 3 kW | No additional central subsidy (max ₹78,000) |
Gujarat State Subsidy — On Top of the Central Amount
Gujarat adds
Reported +₹10,000/kW via SURYA Gujarat (verify)
Gujarat has periodically offered an additional state top-up (reported around ₹10,000/kW for smaller residential systems) delivered through the SURYA Gujarat portal alongside the central subsidy, and PGVCL has covered net-metering costs in some periods. Sources disagree on the current amount and eligibility, so treat this as indicative and confirm the live figure on the SURYA Gujarat portal before budgeting.
Reported figures for Gujarat vary across sources. Treat the above as indicative and confirm the live amount and eligibility with the state agency before committing.
GEDA / SURYA Gujarat PortalSubsidy information verified February 2026. Schemes and amounts change frequently — always confirm with the official state portal or your DISCOM before making a purchase decision.
Electricity Distribution Companies in Gujarat
Your rooftop application is processed by the DISCOM that serves your connection. In Gujarat, the principal distribution companies are:
What Will a System Generate in Gujarat?
At Gujarat’s typical solar resource of ~5.6 peak sun hours per day and a realistic 78% performance ratio, each kW of rooftop solar produces about 133 units/month (1,594 units/year). A common 3 kW residential system therefore generates roughly 399 units/month — compare that against your electricity bill to gauge coverage.
How to Apply from Gujarat
- 1Register on the national portal (pmsuryaghar.gov.in) with your electricity consumer number and DISCOM details.
- 2Submit the online application; the DISCOM reviews technical feasibility for your connection.
- 3After feasibility approval, install the system through any registered vendor of your choice.
- 4Apply for net metering; the DISCOM inspects the plant and installs the net meter.
- 5Submit the commissioning report and bank details — the central subsidy is credited directly to your account, typically within 30 days.
Frequently Asked Questions
- How Much Solar Subsidy Can I Get in Gujarat?
- Beyond the national PM Surya Ghar subsidy (up to ₹78,000 for a 3 kW+ system), Gujarat offers an additional state incentive: Reported +₹10,000/kW via SURYA Gujarat (verify). Gujarat has periodically offered an additional state top-up (reported around ₹10,000/kW for smaller residential systems) delivered through the SURYA Gujarat portal alongside the central subsidy, and PGVCL has covered net-metering costs in some periods. Sources disagree on the current amount and eligibility, so treat this as indicative and confirm the live figure on the SURYA Gujarat portal before budgeting. As state schemes change, confirm the current figure with GEDA / SURYA Gujarat Portal before budgeting (verified February 2026).
- How Much Electricity Will 1 kW of Solar Generate in Gujarat?
- At roughly 5.6 peak sun hours per day and a typical 78% performance ratio, expect about 133 units per month (≈ 1,594 units per year) per kW of installed capacity.
- Which DISCOM Handles Rooftop Solar Applications in Gujarat?
- UGVCL, MGVCL, PGVCL, DGVCL, Torrent Power. Applications route through the national PM Surya Ghar portal, which forwards them to your DISCOM for feasibility approval and net metering.